午夜精品久久久久久毛片,国产午夜精品一区二区三区软件,julia一区二区三区中文字幕,男人的天堂av免,97超碰中文字幕久久精品,国产18禁黄网站禁片免费观看

中文版     ENGLISH 
News
Contact UsMore>>
Shenzhen Baiqiancheng Electronic Co.,Ltd.(BQC)
Address:No.343,Changfeng Road,Changzhen Community, Guangming New District,Shenzhen,Guangdong Province, China 518132
Tel:86-0755-26788241
Fax:86-0755-26788245
Industry NewsNews > Industry News > DIP plug-in considerations    

DIP plug-in considerations

Hits:1  Add Date:2020/3/24

DIPplug-in post-welding processing is a process after SMT chip processing, and theprocessing process precautions are as follows:

 

1.Pre-processing of components

Thestaff of the pre-processing workshop picks up the materials from the BOMaccording to the BOM bill of materials, carefully checks the material model andspecifications, signs, and performs pre-processing according to the model(using automatic bulk capacitor shears, transistor automatic molding machine,fully automatic belt type Processing equipment such as molding machines).

Claim:

The horizontal width of the adjusted component pin needs to be thesame as the width of the *** hole, and the tolerance is less than 5%;

The distance between the component pins and the PCB pads should notbe too large;

If the customer requests, the part needs to be formed to providemechanical support and prevent the pad from lifting.

 

2.Paste high-temperature adhesive tape, enter the board paste high-temperatureadhesive tape, and block the tin-plated through holes and components that mustbe soldered later;

 

3.DIP plug-in processing workers need to bring electrostatic rings, wearanti-static clothes and hats to prevent static electricity, and perform plug-inaccording to the component BOM list and component bit number diagram. Care mustbe taken when inserting the plug-in.

 

4.For the inserted components, check them, mainly check whether the componentsare inserted incorrectly or missed;

 

5.For the PCB board with no problems with the plug-in, the next step is wavesoldering. The wave soldering machine performs automatic soldering processing,which is a firm component.

 

6.Remove the high-temperature adhesive tape, and then check. In this step, themain inspection is to visually observe whether the soldered PCB board is weldedintact;

 

7.Repair and repair the PCBs that are found to be incompletely welded to preventproblems;

 

8.Post-welding, which is a process set for components with special requirements,because some components cannot be directly welded by wave soldering machinesaccording to the process and material limitations, and need to be completedmanually;

 

9.After all components are soldered to the PCB board, a functional test isperformed to test whether each function is normal. If a functional defect isdetected, repair and test processing is required.

PCB Assembly, PCBA Contract Manufacturing, Electronic Manufacturing Services Provider, Electronic OEM/ODM services,PCBA OEM/ODM, Full Turnkey Manufacturing,
Box Build.SMT Assembly, China CM factory, China Contract Manufacturing Supplier, China PCBA supplier, China PCBA factory
贵溪市| 宜兰县| 河南省| 凤山市| 军事| 秦安县| 文成县| 沾化县| 平原县| 革吉县| 格尔木市| 耒阳市| 西乡县| 两当县| 和平区| 无为县| 阳原县| 海南省|