午夜精品久久久久久毛片,国产午夜精品一区二区三区软件,julia一区二区三区中文字幕,男人的天堂av免,97超碰中文字幕久久精品,国产18禁黄网站禁片免费观看

中文版     ENGLISH 
News
Contact UsMore>>
Shenzhen Baiqiancheng Electronic Co.,Ltd.(BQC)
Address:No.343,Changfeng Road,Changzhen Community, Guangming New District,Shenzhen,Guangdong Province, China 518132
Tel:86-0755-26788241
Fax:86-0755-26788245
Industry NewsNews > Industry News > The importance of PCBA production clearance    

The importance of PCBA production clearance

Hits:1  Add Date:2020/11/20

PCBA productionclearance refers to the completion of work orders (task orders) for productsproduced by the production line, which is called clearance. In some PCBAprocessing plants, it is easy to cause problems such as delays and poor qualityof shipments, which will affect the delivery time of customers and the badimpression of customers. Therefore, the PCBA production tailing is veryimportant.

Disadvantages ofuntimely PCBA clearance:

When cleaning thetail, if you need to replenish multiple times, it is easy to waste time andincrease the cost of production. Every time the replenishment line body must bestopped, first check the reason for the thrown material-then apply-and then goto the warehouse to replenish the material. The value of the time of juststopping the line is far greater than the value of the replenishment. It willalso extend the delivery time of the product, causing a bad impression ofcustomers.

The method of PCBAproduction clearing:

1. Before theproduct goes offline, there are about 50 PCB boards. The operator of this linecleans out the bulk materials inside the machine and the material belt trashcan, and the QC inspects the materials according to the specifications andmaterial numbers and prepares the corresponding hand-posted record reports.Quality control check signature confirmation.

2. The operator orinform the follow-up technician classifies the QC from the machine programskipping material for manual repair, and marks the hand-posted material numberon the board, and the quality control check is OK before passing the furnace.

3. If due tomaterial wastage, after hand-posting the materials, the intermediate inspectiontimely counts the number of missing materials to the line operator or teamleader, and the operator and the intermediate inspection QC conduct a secondcheck for materials. Finally, a material replenishment order is issued based onthe loss.

4. Replenishmentof lost materials must be accurate, avoid doing unnecessary work many times.

The speed of PCBAproduction clearance and the quality of the clearance products reflect theservice level of a processing plant.

PCB Assembly, PCBA Contract Manufacturing, Electronic Manufacturing Services Provider, Electronic OEM/ODM services,PCBA OEM/ODM, Full Turnkey Manufacturing,
Box Build.SMT Assembly, China CM factory, China Contract Manufacturing Supplier, China PCBA supplier, China PCBA factory
广饶县| 二连浩特市| 峨山| 偏关县| 莲花县| 太谷县| 察哈| 雅江县| 宁晋县| 彩票| 安乡县| 定结县| 唐海县| 冕宁县| 北宁市| 广安市| 高淳县| 南华县|