午夜精品久久久久久毛片,国产午夜精品一区二区三区软件,julia一区二区三区中文字幕,男人的天堂av免,97超碰中文字幕久久精品,国产18禁黄网站禁片免费观看

中文版     ENGLISH 
News
Contact UsMore>>
Shenzhen Baiqiancheng Electronic Co.,Ltd.(BQC)
Address:No.343,Changfeng Road,Changzhen Community, Guangming New District,Shenzhen,Guangdong Province, China 518132
Tel:86-0755-26788241
Fax:86-0755-26788245
Company NewsNews > Company News > How to automate the PCBA assembly line?    

How to automate the PCBA assembly line?

Hits:1  Add Date:2018/6/26
For PCBA electronic assembly line automation, we feel that [Assembly] is easier to do, or [test] easier to do it? Now the assembly of many actions can rely on the robot arm to help, and the test can do it?


However, with regard to the understanding of Shenzhen Shiqiancheng, it is necessary to perform automation on the production line. In fact, what is lacking most is "people" and it is an "engineer" who adapts equipment. Because whether it is to use a robot arm to help set up a product or test, or to use a modular approach, the tolerances and adaptability of equipment and fixtures will become very important, otherwise an error may create a bad product, even Severely destroyed components.


In addition, when automation is most concerned about “automating for automation”, Shenzhen Baiqiancheng will recommend whether to use automation or not, and whether or not to perform automation or maintenance based on ROI (Return On Investment). What is the most economical and cost-effective production of the original operation, because it is ultimately considered in terms of costs and benefits.


Machine test automation


Taking the current “mobile phone” production as an example, PCBA's automated test of finished products after assembly can use robotic arms to replace the manual taps and touch screen strokes.


The remaining part of the phone is handed over to each other for communication between the Diagnostic Test and the computer's wireless (Bluetooth) commands.


The most troublesome IO connector should be a real plug test. If it is a mobile phone test, you may consider omitting it directly because the phone now has only a headset jack and a micro-USB connector. If the board stage has been tested, it may be possible to directly Omit, or design "Auto-engage" device to achieve.


The final cosmetic inspection (visual/visual inspection) can be performed by the image recognition system.
PCB Assembly, PCBA Contract Manufacturing, Electronic Manufacturing Services Provider, Electronic OEM/ODM services,PCBA OEM/ODM, Full Turnkey Manufacturing,
Box Build.SMT Assembly, China CM factory, China Contract Manufacturing Supplier, China PCBA supplier, China PCBA factory
万源市| 横峰县| 公主岭市| 丰都县| 嘉义县| 滕州市| 清原| 南部县| 秭归县| 沂源县| 普宁市| 来凤县| 东城区| 台北市| 隆回县| 新野县| 民丰县| 舒兰市|